There is so much going on in May as renovations begin!  You are going to see a lot of construction on the First Floor as contractors work to complete the disruptive work before everyone returns for Fall 2019.

Here is the break down of what is happening over the next few weeks.


  • Front Computer Lab
    • UITS, electricians, and movers have moved the front computer lab to start work on renovations that include cutting new windows and creating a new study area at the front of the library.  
    • All computers, scanners, and printers are now in the Back Lab in front of the Help Desk. 



  • Library Entrance
    • Construction will begin on the Circulation and Reference desks soon.  All services will remain the same and the only difference you will see here is a possible location change as both desks shift back to allow for construction on the entrance. 
  • Reference Books
    • The reference books and shelving have moved to make way for a new study area.
  • Second Floor
    • Books and shelving have been moved from the Second Floor as construction is set to begin on the CSU Advise and Tutoring offices.